Note: The PD&E Study Preliminary Engineering Report for SR426/CR419 has been divided into sections to allow for quicker download time. Please be patient as some items may take longer to open than others. Sections of the PD&E report that are not available on the website (due to their large file size) can be obtained through a records request to the City Clerk's office.
This document presents the evaluation of the proposed transportation improvements to SR426/CR419 (Broadway Street) from Pine Avenue to west of Lockwood Boulevard. The proposed action addressed in the report involves the reconstruction of SR426/CR419 from a two-lane undivided roadway to a four-lane divided roadway.
The project consists of improved travel lanes, median separation, closed drainage system, and multi-modal improvements including continuous bicycle lanes adjacent to the roadway and continuous sidewalks that also provide connectivity to adjacent recreational trails.