Project Development & Environment (PD&E) Study SR426/CR419

Note: The PD&E Study Preliminary Engineering Report for SR426/CR419 has been divided into sections to allow for quicker download time.  Please be patient as some items may take  longer to open than others. Sections of the PD&E report that are not available on the website (due to their large file size) can be obtained through a records request to the City Clerk's office.

This document presents the evaluation of the proposed transportation improvements to SR426/CR419 (Broadway Street) from Pine Avenue to west of Lockwood Boulevard.  The proposed action addressed in the report involves the reconstruction of SR426/CR419 from a two-lane undivided roadway to a four-lane divided roadway. 

The project consists of improved travel lanes, median separation, closed drainage system, and multi-modal improvements including continuous bicycle lanes adjacent to the roadway and continuous sidewalks that also provide connectivity to adjacent recreational trails.

City Events Calendar

«  
  »
S M T W T F S
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30
 
Add to calendar