Equipment Wash and Storage Building Project

Equipment Wash and Storage Building Project

Engineering and Design Services ares currently underway for a heavy equipment and large fleet vehicles wash down facility and a 40-foot by 175-foot equipment storage building located at the Public Works complex on Evans Street.

Dial Building Renovation Project

Dial Building Renovation Project

The City has contracted with GLE Architectural Seervices to perform a pre-renovation asbestos survey for an existing 2,800 sq. ft.

Carib and Tomoka 6-inch Water Main Project

Carib and Tomoka 6-inch Water Main

Carib Lane and Tomoka Drive 6-inch Watermain Upgrade Project is identifield in the City's 5 Year Capital Improvement Program.  The watermain will be upgraded from an 2-inch pipe to a 6-inch ductile iron pipe.  VHB, a Continuinig Engineering Consultant for the City has been engaged to design the project in conjunction with the Lawton Element

Big Oaks & Twin Rivers Phase 1 Retrofit

 Big Oaks and Twin Rivers Phase I Development

Lawton Elementary School Sidewalks

In September of 2010, the City submitted a "Safe Routes to School" Infrastructure Application to the Florida Department of Transportation (FDOT) for funding consideration of the Lawton Elementary School Sidewalk Project.  The project involves sidewalk improvements along several roadways within the vacinity of Lawton Elementary School to improve walking conditions for students att

Completed Capital Projects

The Engineering Department coordinates the design, permitting and construction of the City's Capital Improvement Projects which are prioritied annually by the adoption of the 5 Year Capital Improvement Progam.  Below is a list of some of the recently completed projects. 

Wastewater Headwork's Improvements

The Wastewater Headwork's Improvement Project is currently underway at the newly acquried Wastewater Treatment Plant.  The project involves the replacement of three existing flow equalization tanks with a single new flow equalization tank and one automatic bar screen with a manual back-up screen to provide more efficient operation.  Specifically, the project provides new aeration

Reclaimed Water Projects

The Reclaimed Water Interconnect Project was completed in September, 2011 by Blue Ox Enterprises for a cost of $50,000.  

Raw Water Main Conversion and Water System Improvement Project

The Raw Water Main Conversion and Water System Improvement Project was substantially complete on January 6, 2011.  This approximately $1 million dollar water system improvement project began in February of 2010 to improve system water quality and pressure.  The projected converted a raw water line that transmitted water to the AM Jones Water Treatment Plant into a potable&nb

City Events Calendar

«  
  »
S M T W T F S
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30
 
Add to calendar